EPA Provided Update on Hackensack River Cleanup

The federal government updated the remediation status of a waterway contaminated by decades of industrial heavy metals.

Updated on Sept. 22, 2026 in Environmental

Bold flat-color illustration showing a stylized industrial pipe partially submerged in mud, evoking environmental remediation policy.
The EPA released a progress update on the Lower Hackensack River Superfund site, detailing ongoing efforts to remediate heavy metal contamination in riverbed sediment. AI Illustration. Upload story photo >

Live Poll

Should the federal government prioritize Superfund site cleanups regardless of changing political administrations?

The U.S. Environmental Protection Agency provided an update regarding the Superfund status of the Lower Hackensack River. This site, which includes riverbank sections like those in Secaucus, has been under federal oversight for remediation since 2022.

Why it matters

The federal designation marks a shift in how New Jersey manages long-term industrial contamination of its waterways. Decades of intensive industrial activity led to the current accumulation of pollutants that necessitates large-scale intervention.

The remediation effort targets river mud containing high concentrations of chromium and other heavy metals. The cleanup scope encompasses the river's path, where industrial activity caused heavy metal accumulation exceeding safety thresholds.

The players

U.S. Environmental Protection Agency

The federal regulatory body responsible for managing the cleanup and hazardous waste remediation of designated Superfund sites.

President Donald Trump

The current President of the United States who oversees federal executive agencies including the EPA.

The details

The cleanup process involves the extraction and treatment of sediment, known as river mud, which currently hosts significant heavy metal deposits. Specialized federal resources are directed toward isolating and remediating these contaminants, which were released into the riverbanks by industrial processes over many years.

Timeline

  1. September 2022: The Lower Hackensack River received official federal Superfund status.

  2. January 2023: President Donald Trump began his second term.

  3. September 21, 2026: The EPA provided an update on the Superfund status.

The Tech Race

The Hackensack River project follows the oversight framework established by the Comprehensive Environmental Response, Compensation, and Liability Act. This site now joins a national registry of long-term environmental remediation programs managed under this federal mandate.

Residents near the Lower Hackensack River should expect ongoing federal activity focused on sediment management and riverbank remediation. Future site developments will dictate access to specific river segments as the cleanup proceeds.

The takeaway

The federal Superfund status indicates a long-term commitment to addressing legacy industrial contamination in the river. Observers should track future EPA reports for specific remediation milestones and finalized timelines for the site in Secaucus.

Further reading

For more information on state-wide remediation, see the New Jersey Environmental section.

Source note: This article includes information reported by Patch.

Live Poll

Should the federal government prioritize Superfund site cleanups regardless of changing political administrations?

EPA Provided Update on Hackensack River Cleanup